Loading color scheme

PILE DRIVING

Looking for a new lift or to upgrade an existing lift, you may need new pilings.

 

Your new lift relies on the integrity of the pilings supporting it.  When adding a lift to an existing dock, aging or undersized pilings may need to be replaced.  Additionally, your lift may require additional pilings.  Our pile driving barge will navigate to your dock and add or replace all the required pilings.